
Quality guarantee armature for toyota NISSAN IM3144 Armature
Applicable models:NISSAN
Reference part number:237825 SAM7825CL SAM7825LC SAM7825YJ M106X43871 233101P115 IM3144 462-27653-W 318N10196Z
| Rated output : | 12V 1.7KW |
| Pulley : | 11T 25PCS |
| Size : | Lenght:141 mm Outside diameter:54 mm |
| Weight : | net weight:1.5KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | STARTER ARMATURE |
| Specification : | 12V 1.7KW |
| Pulley : | 11T |
| Brand : | NUOJIN |
| Number : | IM3144 |
| Quality : | NEW |
| Delivery time : | 10DAY |




Installation Method for Nissan 12V 1.7KW Starter Armature
I. Pre-installation Preparation
1. Power Off and Safety Protection
Disconnect the negative battery cable and wait for more than 5 minutes to allow the internal capacitor of the starter to fully discharge, preventing short-circuit sparking or electric shock.
Use tools with insulated handles during operation to avoid short-circuiting the armature and housing; keep the work area dry and free of flammable and explosive oil stains.
2. Component Cleaning and Inspection
Armature Inspection: Check if the armature shaft is bent, the commutator is worn or ablated, and the windings are damaged; test the insulation resistance between the armature winding and the shaft/housing with a 500V megohmmeter. A value ≥1MΩ is qualified; otherwise, the armature must be replaced.
Brushes and Brush Holder: The brush length must meet the standard (generally not less than 6.5mm), the brushes should move flexibly in the brush holder, and the spring tension should be approximately 0.8kg (1.76lb). Replace the brushes if contact is poor.
Cleaning: Wipe the commutator and brush contact surfaces with a dust-free cloth dipped in anhydrous ethanol to remove oil stains and dust; the armature windings and solenoid switch can only be wiped with gasoline-wrung cotton yarn or blown clean with compressed air. Corrosive cleaners are prohibited.
3. Tool and Material Preparation
| Tool/Material | Purpose |
|---|---|
| Socket wrench, torque wrench | Disassembling and tightening bolts, controlling torque |
| Snap ring pliers | Assembling and disassembling snap rings on the armature shaft |
| 500V megohmmeter | Testing insulation resistance |
| Feeler gauge | Measuring the armature axial end clearance |
| High-temperature lithium-based grease | Lubricating armature journals, bearing bushes, etc. |
| Anhydrous ethanol, dust-free cloth | Cleaning components |
II. Installation Steps
1. Armature Pre-assembly
Lubrication: Apply high-temperature lithium-based grease only to the armature journal, bearing bushings, and shift fork pin shaft. The dosage should cover the contact surface without overflowing. Grease is strictly prohibited from contacting the commutator, brushes, and winding surfaces.
One-way Clutch Installation: Install the one-way clutch on the armature shaft to ensure it slides smoothly along the shaft without jamming; install the thrust washer and snap ring, and ensure the snap ring is properly seated to prevent axial movement of the clutch.
2. Armature Placement into Housing and Positioning
When placing the armature into the housing, align it with the concentric position of the stator magnetic poles and armature core. Do not force it in if jamming occurs; check if the bearing bushings are eccentrically worn or the shaft is bent.
For armatures with brush holders, support the armature during installation to prevent it from being pulled out of the brush holder by the magnetic force of the yoke assembly.
3. End Cover and Brush Installation
Brush Installation: Lift the brush spring with a special tool, insert the brush into the brush holder, and ensure good contact between the brush and commutator; reset the brush spring to ensure uniform pressure.
End Cover Assembly: Align the front end cover, rear end cover with the housing, and ensure the marks match (e.g., positioning marks on the stator and end cover). Insert the long bolts, pre-tighten them in batches in a diagonal cross sequence, and finally tighten to the torque strictly following the technical manual (generally, the end cover bolt torque is 10-12N·m, and the starter assembly bolt torque is approximately 37N·m).
4. Clearance Adjustment
Axial End Clearance Calibration: The armature axial end clearance must be controlled within 0.10-0.25mm, adjusted by adding or removing adjusting washers at the end cover. Installation is prohibited without calibration.
Pinion and Thrust Washer Clearance: The initial contact position is 1.5-2.5mm, and the full-stroke position is 0.5-1.5mm. If the clearance is abnormal, adjust the shift fork or one-way clutch to prevent gear meshing impact or failure to disengage.
5. Solenoid Switch Installation
Install the solenoid switch, connect the wires, and tighten the terminal nut to approximately 9.8N·m. Ensure the solenoid switch cooperates well with the shift fork and the plunger moves smoothly.
6. Assembly Installation and Testing
Install the starter assembly on the engine, tighten the bolts to the specified torque (approximately 37N·m), and install the gasket to prevent air leakage.
No-load Test: Connect a temporary power supply for no-load operation (single operation duration ≤5 seconds). It is required to run smoothly, with no strong sparks on the commutator and no obvious swing of the armature; otherwise, disassembly and re-inspection are necessary.
Load Verification: Observe the meshing state during the first start after installation. If gear impact or weak starting occurs, stop the machine immediately to check the clearance or one-way clutch. Repeated forced starting is prohibited.
III. Post-installation Inspection
Test the insulation resistance again with a 500V megohmmeter to ensure it is ≥1MΩ.
Check that all connection parts are firm and free of looseness; the wiring harness is connected correctly with no short-circuit hazards.
Start the engine and observe the starter's working state. It is qualified if it runs smoothly without abnormal noise or vibration.
IV. Key Precautions
When carrying the armature, lift it by the journal or iron core; do not grasp the windings to prevent damage to the enameled wire and short circuit.
It is strictly forbidden to directly strike the armature shaft or commutator with a metal hammer to prevent shaft bending or commutator segment deformation.
If components need to be adjusted during installation, power off first to avoid safety accidents caused by live operation.
A torque wrench must be used to tighten all bolts in strict accordance with the specified torque to prevent housing deformation or component loosening.
References:
Source Explanation of the Installation Method for Nissan 12V 1.7KW Starter Armature
Information Sources and Matching Points
| Source Type | Specific Sources | Content Matching Points |
|---|---|---|
| Nissan Official Maintenance Data | Maintenance manuals for models such as Sylphy/Tiida/Sunny (e.g., Nissan Versa N17) | Starter assembly bolt torque of approx. 37 N·m, terminal nut torque of approx. 9.8 N·m; armature axial end clearance of 0.10–0.25 mm; pinion-thrust washer clearance of 1.5–2.5 mm (initial)/0.5–1.5 mm (full stroke); insulation resistance ≥1 MΩ; diagonal cross pre-tightening of end cover bolts. |
| Industry-General Maintenance Specifications | Automobile starter disassembly/assembly tutorials, vocational college courseware, maintenance manuals | Power-off protection, cleaning and inspection, lubrication requirements, clearance adjustment; brush installation and spring reset; no-load/load test procedures. |
| Component Technical Parameters | Technical documents of matched starters (e.g., Bosch/Denso) | 12V 1.7KW specification; one-way clutch and shift fork adjustment standards; application scope of high-temperature lithium-based grease. |
| Maintenance Platforms and Cases | Pacific Auto, Autohome, auto repair teaching plans | Component cleaning methods (anhydrous ethanol/compressed air); brush length ≥6.5 mm, spring tension approx. 0.8 kg; prohibition of striking the armature shaft and commutator. |
Key Basis
Torque and Clearance: The assembly bolt torque of 37 N·m, terminal nut torque of 9.8 N·m, axial end clearance of 0.10–0.25 mm, and gear clearance of 1.5–2.5 mm/0.5–1.5 mm are all derived from Nissan's official technical documents.
Safety and Processes: Requirements such as power-off operation, use of insulated tools, prohibition of striking, and lubrication restrictions comply with universal safety standards for automotive electrical maintenance.
Assembly Procedures: Armature housing positioning, diagonal pre-tightening of end cover bolts, brush installation, and clearance adjustment refer to industry-general processes.
Methods to Obtain Official Original Documents
Nissan Official Channels: Contact authorized dealers or after-sales centers to purchase maintenance manuals for corresponding models (e.g., Nissan Engine Electrical System).
Professional Databases: Retrieve the starter disassembly/assembly chapter through EPC or maintenance information systems.
Component Manufacturers: Visit official websites of Bosch/Denso to query technical specifications for specific starter models.

