
Starter CD569F211501-0100 3708010-A11 is suitable for Changan UNI-K
Applicable models:Changan UNI-K
Reference part number:CD569F211501-0100 3708010-A11
| Power horsepower : | 12V 1.6KW |
| Number of feet : | |
| Size : | 24*12*16single unit inner box |
| Weight : | |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | starter |
| Specification : | 12V 1.6KW |
| Number of feet : | |
| Brand : | NUOJIN |
| Number : | CD569F211501-0100 3708010-A11 |
| Quality : | Remanufacture |
| Delivery time : | 10 day |




Installation Method for 12V Starter of Changan Automobile
I. Pre-installation Preparation
- Safety and Power-offTurn off the vehicle engine, disconnect the negative cable of the battery (critical for preventing short circuits), and switch off the ignition. For models equipped with an engine control unit (ECU), this step is mandatory.
- Tools and MaterialsPrepare socket wrenches (commonly 12–16mm), a torque wrench, flathead and Phillips screwdrivers, insulating tape, cleaning cloths, and high-temperature resistant grease (for the overrunning clutch and bushings).
- Accessory VerificationConfirm that the model of the new starter matches the original one; inspect the overrunning clutch, solenoid switch, and wiring terminals for damage. Clean the mounting surface (the joint between the engine and transmission) to remove oil stains, rust, and impurities.
- Reference to the Old UnitIf replacing the starter, record the positions of the fixing bolts and the routing of electrical connectors/terminals of the old starter to prevent incorrect installation.
II. Installation Procedures (Reverse of the Disassembly Steps)
- Positioning and Pre-installation
Push the starter into the mounting position, ensuring that the drive gear aligns with the flywheel ring gear and the mounting holes are coaxial with the bracket holes on the engine side. Do not strike the starter; push it into place manually.
Apply a small amount of grease to sliding parts such as the drive bushing and helical spline to reduce running resistance.
- Fastening the Fixing Bolts
Insert 2–3 fixing bolts and hand-tighten them initially (to prevent thread seizing).
Use a torque wrench to tighten the bolts symmetrically according to the torque specified in the vehicle maintenance manual (typically 18–25 N·m; e.g., approximately 22 N·m for Changan CS75). Over-tightening may cause housing deformation, while under-tightening can lead to vibration.
- Electrical Wiring Connection (Follow the Exact Sequence)
First, connect the thin control wire connector on the solenoid switch (mostly a waterproof buckle; confirm locking by hearing a "click" sound).
Then, connect the main power cable (thick wire, connected to the large terminal of the battery positive electrode), fasten it with a nut and add a lock washer to ensure no looseness.
When routing the wires, keep them away from high-temperature and moving components (such as the exhaust manifold and pulley) to prevent abrasion and short circuits.
- Power Restoration and Inspection
Confirm that all connectors and wires are securely fastened, no tools are left behind, and reconnect the negative cable of the battery.
After power-on, first perform a no-load test: turn the key to the "START" position; the starter should run smoothly without abnormal noise or slipping. Then conduct a start-up test: the engine should ignite smoothly, and the starter must disengage from the flywheel ring gear immediately after the engine starts.
Precautions for Installation of 12V Starter of Changan Automobile
Power-off Operation Is the Top Priority
Violent Operation Is Forbidden During Component Installation
Lubrication Operation Must Be Accurate and Standardized
Wiring Connection Must Follow the Prescribed Sequence and Requirements
Wiring Sequence
Torque Parameters Must Be Strictly Adhered To
Post-installation Testing Must Be Conducted Step by Step
References:
I. Official Core Basis (Authoritative Sources)
- Original Factory Maintenance Manuals for Various Changan ModelsThese manuals cover the starter disassembly and assembly chapters of mainstream Changan models, including CS35/55/75, Eado, Yuesxiang, BenBen, etc. The core contents include power-off procedures, bolt torque parameters (18–25 N·m), wiring sequence, no-load/start-up test specifications, etc., serving as the primary source of the content. For example, the Changan CS75 maintenance manual clearly specifies the torque of starter fixing bolts and the wiring connection requirements for the solenoid switch.
- Changan Automobile Technical Service BulletinsThese bulletins specify special installation requirements for starters equipped on models with start-stop systems and intelligent anti-theft systems, such as the capacitor discharge waiting time after power-off and the model matching requirements for dedicated starters.
II. Industry and National Standard Basis (Compliance Support)
| Standard Number | Standard Name | Core Relevant Points |
|---|---|---|
| QC/T 518-2013 | Technical Specifications for Automobile Starters | Performance test requirements, electrical safety standards, and component protection regulations after starter installation |
| GB/T 18297-2013 | Test Methods for Automobile Engine Performance | Operating conditions and evaluation criteria for start system testing |
| GB/T 16823.2-1997 | General Rules for Fastener Tightening | General specifications for symmetrical tightening of fixing bolts and torque control |

