
Automobile AC generators 23100-8J10A, 231008J100.231008J10A 23108J10B are suitable for Nissan
Applicable models: Nissan
Reference part number:23100-8J10A, 231008J100.231008J10A 23108J10B LR1110721,LR1110721B,LR1110721E,LR1110721F 2310M8J10BRW,2653013.TG12C035 ALHO721MQ,ALHO721US,ALH0721UX 13940N,301N22396Z
| Rated output : | 12V 110A |
| Pulley : | 6PK |
| Size : | 24*18*17single unit inner box |
| Weight : | Net weight 6.2KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | alternator |
| Specification : | 12V 110A |
| Pulley : | 6PK |
| Brand : | NUOJIN |
| Number : | 23100-8J10A |
| Quality : | Remanufacture |
| Delivery time : | 10 day |





Pre-installation Preparation
Park the vehicle on a flat surface, pull the handbrake tightly, turn off the engine and wait for a period of time to let it cool down, so as to avoid being scalded by high-temperature components during operation. Prepare tools such as a ratchet wrench, socket, torque wrench, jack, safety stand, etc., and you can also prepare medium-strength thread locking adhesive.
Use the jack and safety stand to lift the right side of the vehicle body to facilitate the subsequent removal and installation of the generator's lower bolts; then disconnect the negative terminal of the battery to cut off the power supply of the entire vehicle, preventing short circuits or electric shocks during operation.
Removal of the Old Generator
The generator of Nissan models is mostly located on the right front side of the engine. After finding it, first pull out the generator signal wire connector, then use a ratchet wrench with a socket to loosen the generator positive wire bolt and remove the positive wire. Then loosen the generator's fixing through bolt without completely removing it temporarily.
Loosen the fixing bolt on the right side of the belt tensioner, then loosen the vertical adjustment bolt to relax the belt, and then remove the drive belt.
Completely remove the adjustment bolt of the tensioner, unscrew the nut of the generator's lower through bolt, pull out the through bolt, and the old generator can be taken out completely. If the bolt is rusted, spray rust remover and let it stand for a while before operation to avoid bolt stripping.
Installation of the New Generator
First, clean the dust and oil at the generator installation position to ensure the installation surface is clean, preventing impurities from causing loose installation or abnormal vibration during operation. Place the new generator in the installation position, insert the lower through bolt back, and screw on the nut but do not tighten it temporarily.
Install the generator positive wire in the correct direction and put on the bolt, then insert the signal wire connector back. Install the upper tensioner bolt with fixing and adjusting functions, first screw on the horizontal bolt, then clamp the vertical bolt into the adjustment slot, and gently tighten the horizontal bolt.
Install the drive belt on the crankshaft pulley, water pump pulley and generator pulley in sequence, adjust the vertical bolt, and press down the generator to adjust the belt tension. It is appropriate that the belt can be easily bent to about 90 degrees by hand.
Tighten all kinds of bolts with a torque wrench. Both the upper fixing bolt and the fixing nut of the lower through bolt are tightened to 23 N・m, and the fixing nut of the positive wire is tightened to 18 N・m. If necessary, apply thread locking adhesive to enhance firmness.
Subsequent Inspection and Commissioning
First, check whether the generator is firmly installed and whether the line connectors are properly connected. After confirming that no tools or parts are left in the engine compartment, lower the vehicle body and reconnect the negative terminal of the battery.
Start the engine, observe whether the relevant indicator lights on the instrument panel are normal and whether there is any abnormal noise. In the idle state, a multimeter can be used to measure the generator output voltage, and the normal range should be 13.5 - 14.5V.
Let the engine idle for 3 - 5 minutes, then conduct a short-distance driving test. Confirm that no fault lights are on during driving and the generator power generation status is stable, then the installation is completed.
Safe Operation to Avoid Electrical Risks
Disconnect the battery negative terminal before disassembly and assembly, and keep it disconnected until all installation and wiring are completed. This prevents short circuits caused by accidental contact during operation, which could burn core electrical components such as the generator regulator and ECU. It is recommended to wear insulated gloves and goggles during operation to avoid electric shock or scratches from sharp parts in the engine compartment.
Use insulated tools matching the bolt specifications. Do not use brute force on rusted fixing bolts—spray rust remover and let it stand for a while before operation to prevent bolt stripping or damage to the generator housing. Meanwhile, avoid oil pipes and coolant pipes in the engine compartment to prevent leakage due to collision.
Accessory Compatibility and Quality Control
Prioritize Nissan original factory or officially authorized generator accessories. The new generator must be accurately matched to the vehicle’s specific engine model. Verify key dimensions such as the number of pulley grooves, mounting hole positions, and terminal types to ensure consistency with the old generator, avoiding power generation abnormalities caused by compatibility issues.
Prohibit the use of low-quality non-standard accessories. Such accessories not only have unstable power generation efficiency but may also damage the entire vehicle electrical system due to poor internal component quality, increasing subsequent maintenance costs.
Precise Installation for Stable Operation
Thoroughly clean the generator mounting position of dust, oil, and debris before installation, especially screw holes and contact surfaces. Impurities can lead to loose installation, resulting in generator vibration or resonance during vehicle operation. If there are bolt washers, reinstall them in their original positions—manually pre-tighten fixing bolts first, then fasten them to the standard torque with a torque wrench.
Adjust the drive belt tension appropriately: apply approximately 10kg of pressure to the middle of the belt, and the normal deflection should be between 8–12mm. An overly loose belt may slip and cause insufficient power generation, while an overly tight belt will increase the load on the generator bearings and shorten their service life. Additionally, ensure the generator pulley is aligned with the engine-side pulley—excessive deviation will accelerate belt wear or cause it to fall off.
Distinguish terminals accurately during wiring: for example, the "B+" terminal connects to the power output wire, and the "D+" or "F" terminal connects to the excitation wire. Never reverse the connections. After wiring, tighten the terminal nuts and check that the joint sealing rings are intact to prevent short circuits caused by water ingress or poor contact.
References:
Nissan Model-Specific Maintenance Manuals
Some installation precautions are derived from exclusive maintenance guidelines. For example, the maintenance manual for Nissan Sylphy clearly specifies steps such as disconnecting the negative battery terminal, removing the cooling fan and drive belt when disassembling the generator, and mentions sealing the openings of hoses and pipelines to prevent fluid leakage during removal.
The maintenance manual for Nissan Qashqai models equipped with the HR16DE engine details installation specifics, such as pre-tightening generator bolts from bottom to top and then finalizing tightening from top to bottom.
In addition, exclusive maintenance documents for models like the Nissan Almera Classic and Nissan Paladin also explain safety operations and key steps for generator disassembly and assembly corresponding to their respective models.
Professional Automotive Repair Platforms
Professional platforms focusing on automotive repair knowledge sharing, such as Qiche Dashi (Car Master), have published popular science content on Nissan generator maintenance. This content covers basic precautions including disconnecting power to prevent electric shock during disassembly/assembly, inspecting wires to avoid insulation damage and short circuits, and controlling bolt tightness. It also reminds non-professionals to avoid blind operation.
These contents are summarized based on extensive practical maintenance experience with Nissan models, making them suitable for daily maintenance scenarios.
General Generator Technical Service Materials
General technical documents such as the "Generator Technical Service Guide" included in Jinchutou Document Library are not limited to Nissan models, but their general precautions for generator installation are also applicable.
Examples include requirements such as tightening installation bolts to the specified torque, adjusting drive belt tension appropriately, and installing heat shields to keep the generator away from the engine exhaust pipe. These provide general technical specifications for the installation of Nissan 12V generators.

