
alternator FG12T037 23100-3RA2B 23100-3RC2B 23100-3SH2B for Nissan SETRA B17 Sylphy 1.8
Applicable models:Nissan SETRA B17 Sylphy 1.8 2014
Reference part number:FG12T037 23100-3RA2B 23100-3RC2B 23100-3SH2B ALV8912 23100-3RA2B 23100-3SH2B 2611855B 11673N 2611855B, FG12T039 FG12T035 FG12T039 JFZ1928N UD19318A 165.934.110.500 23100-3RC2B 23100-3RA2B, 23100-3RC2B, 23100-3SH2B,23100-3RC2B
| Rated output : | 12V 110A |
| Pulley : | 6PK |
| Size : | 24*18*17single unit inner box |
| Weight : | net weight:5.4KG gross weight:5.65KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | Altemator |
| Specification : | 12V 110A |
| Pulley : | 6PK |
| Brand : | nuojin |
| Number : | 23100-3SH2B FG12T037 23100-3RA2B |
| Quality : | Remanufacture |
| Delivery time : | 10 day |





Installation Method for Nissan 12V Generator
Pre-Installation Preparation
Tools and Accessories: Prepare a 12V original generator compatible with the model, along with tools such as a ratchet wrench, sockets, torque wrench, screwdriver, jack, safety stand, and medium-strength thread locker. If the generator installation area of the vehicle requires sealing, prepare additional sealant.
Safety Protection: Park the vehicle on a flat and safe surface, engage the handbrake, turn off the engine, and wait for it to cool down to avoid burns from high-temperature components. Then disconnect the negative terminal of the car battery to completely cut off the power supply of the entire vehicle, preventing short circuits that may damage electrical components during installation.
Auxiliary Disassembly to Expose Components: For some models, use a jack with a safety stand to lift the right side of the vehicle to facilitate access to the bolts under the generator; for some new models such as the Qashqai, it may also be necessary to remove the oil dipstick tube fixing bolt or the radiator expansion tank to fully expose the generator installation position.
Core Installation Operations
Preliminary Fixation of the New Generator: Place the new generator on the mounting bracket and align it with the upper and lower fixing bolt holes. First insert the lower through-bolt and screw on the nut, then install the upper adjustable tensioner bolt—do not fully tighten either to reserve space for subsequent belt tension adjustment. Ensure the surface of the generator’s pulley side fits the installation reference plane to guarantee installation accuracy.
Wiring Connection: Locate the generator’s "B" terminal, connect the wire corresponding to the battery’s positive electrode to this terminal, and put on the nut for preliminary fixation. Then fully insert the generator signal wire connector and confirm the buckle is locked to avoid poor contact. During subsequent tightening, it is recommended to torque the positive wire fixing nut to 18 Newton-meters.
Install and Adjust the Drive Belt: Follow the original vehicle’s belt routing to fit the belt over the generator pulley, crankshaft pulley, water pump pulley, and other corresponding components, ensuring the belt is fully embedded in the pulley grooves. Adjust the belt tension by turning the generator’s vertical tension bolt to press down the generator—ideally, the belt can be easily bent to approximately 90 degrees by hand. This prevents excessive looseness (which causes slipping) and excessive tightness (which accelerates bearing and belt aging).
Tighten the Fixing Bolts: Use a torque wrench to tighten the bolts in accordance with specifications. Prioritize following the model manual; the general standard is to torque the upper and lower fixing bolts to 23 Newton-meters. It is recommended to tighten the lower bolt first, then the upper bolt, ensuring the generator is firmly fixed to avoid vibration and abnormal noise during operation.
Final Debugging and Inspection
Restore Auxiliary Components: If the oil dipstick tube, radiator expansion tank, wheels, or fenders were removed earlier, reinstall them one by one in the reverse order of disassembly. Then lower the vehicle and reconnect the negative terminal of the battery.
Operational Status Inspection: Start the engine and let it idle for 1-2 minutes. Observe if the generator produces abnormal noise and check if the belt slips or misaligns.
Voltage and Detail Inspection: Use a multimeter to measure the voltage across the battery. A voltage between 13.5-14.5V at idle indicates the generator is working normally. Additionally, check for overheating or burning odors at the wiring connectors and confirm all bolts are tight. If no abnormalities are found, the installation is complete.
Key Precautions for Nissan 12V Generator Installation
I. Non-Negotiable Safety Operations
The power-off step must be performed first and thoroughly. Disconnect the battery’s negative terminal before any installation work; live wiring or component adjustment is strictly prohibited. This prevents short circuits that could burn out core electrical components such as the generator regulator and vehicle ECU.
Avoid accidental tool grounding. Keep metal tools (e.g., ratchet wrenches, sockets) away from live parts like generator terminals and the battery’s positive electrode. Prevent tools from touching both positive and negative poles simultaneously, which can cause grounding and spark hazards.
Protect personal safety and vehicle components. Wear anti-slip gloves and goggles to avoid burns from high-temperature parts, skin contact with oil stains, or injuries from falling tools/components. When lifting the vehicle with a jack, always use a safety stand for stabilization—never work with the vehicle supported solely by a jack to prevent collapse.
II. Strict Control of Installation Accuracy
Follow bolt torque specifications. Prioritize the maintenance manual of the corresponding model; the general standard is 23N・m for fixing bolts and 18N・m for positive wire nuts—do not arbitrarily increase or decrease the torque. Loose bolts cause generator vibration and abnormal noise; over-tightening damages bracket threads or the generator housing.
Ensure proper belt routing and tension. The belt must follow the original vehicle’s routing—incorrect routing renders the generator inoperable. Adjust tension to a state where the belt can be easily bent to approximately 90 degrees by hand. Excessive looseness leads to slipping and wear; excessive tightness accelerates bearing and belt aging, shortening service life.
Achieve precise wiring connections. The generator’s "B" terminal must only connect to the battery’s positive wire. Fully insert the signal wire connector and lock the buckle to avoid poor contact. Tighten wiring nuts to the specified torque to prevent loosening or terminal deformation.
References:
Sources of Nissan 12V Generator Installation Information
- MotorMaster: This platform features multiple articles on Nissan generator installation. These cover precautions such as prioritizing original accessories, disconnecting power before disassembly/assembly, ensuring secure wiring connections, and adjusting bolt tightness appropriately. They also mention seeking assistance from professional technicians if one lacks operational proficiency—content that highly aligns with the installation-related precautions you focused on.
- Autohome: Its Q&A section includes information on generator installation for Nissan Cefiro. This covers key notes like verifying generator-model compatibility before installation, disconnecting the battery’s negative terminal, and tightening bolts per specifications. It serves as a reference source for Nissan generator installation precautions.
- Pacific Automobile: The platform publishes general automotive generator installation processes and wiring standards. Content such as adjusting belt tension during installation, conducting insulation treatment after wiring, and using tools to test voltage is also applicable to Nissan 12V generator installation, making it an important reference for relevant precautions.
- Nissan model-specific maintenance manual pages: For example, the Nissan Sylphy maintenance manual pages on nisentra.com detail specifications like the tightening sequence of bolts during generator disassembly/assembly and key points for terminal nut operation. Maintenance documents related to Nissan generators on automanuals.biz also specify safety taboos for charging system operations. These serve as professional source references for Nissan generator installation precautions.

