
Acgenerator suitable for lsuzu 6hk1 0620000060 6HK1 0620000021 0620000040 0620000020 0620000030
Applicable models:lsuzu 6hk1
Reference part number:0620000060 6HK1 0620000021 0620000040 0620000020 0620000030
| Rated output : | 24V 80A |
| Pulley : | 3PK |
| Size : | 24*18*17 single unit inner box |
| Weight : | net weight:9.5KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | ACgenerator Alternator |
| Specification : | 24V 80A |
| Pulley : | 3PK |
| Brand : | NUOJIN |
| Number : | 0620000060 |
| Quality : | NEW |
| Delivery time : | 10 day |




Complete Installation Method for Isuzu 24V Generator
I. Core Safety Requirements and Preparation (Mandatory Compliance)
Power-off Safety
Tools and Consumables
Tools: Torque wrench (accuracy ±3%), socket wrenches (10/13/16mm), multimeter, special tool for belt tensioner, insulated tools.
Consumables: Contact cleaner, high-temperature grease (temperature resistance ≥180℃), medium-strength blue thread locker, insulated terminal covers, drive belt (replace if necessary).
Accessories: Generator (matching OEM part number), mounting bolts (must be replaced with new ones), belt tensioner pulley (replace if worn), waterproof sealing rings.
Protective Equipment: Insulated gloves, safety goggles, dust mask.
Accessory Verification
II. Disassembly Procedures for the Old Generator
- Disconnect Electrical ConnectionsUnplug the regulator connector (mark the position), remove the B+ terminal nut (torque: 6–8N·m), take off the insulated cover, and disconnect the ground wire.
- Remove the Drive BeltLoosen the belt with a tensioner tool, take off the drive belt, and check that the belt has no cracks or excessive wear (thickness ≥80% of the original).
- Remove Mounting BoltsRemove the generator mounting bolts (commonly M8, torque: 36–46N·m) and adjusting plate bolts (torque: 14–24N·m), then take out the old generator.
- Clean the Mounting SurfaceRemove oil stains and rust from the mounting bracket and generator lugs; check that the bracket is not deformed and the bolt holes are not stripped.
III. Installation Procedures for the New Generator
- Positioning and Pre-fixationPlace the new generator into the mounting position, align with the lug holes, manually screw in the mounting bolts 2–3 turns, and ensure tight fit with the engine bracket.
- Torque Tightening
Generator mounting bolts: 36–46N·m (standard for Isuzu A-4JA1 and other models).
Adjusting plate bolts: 14–24N·m (final tightening after belt installation).
- Belt Installation and Tension Adjustment
Install the belt, adjust the tension with a tensioner tool: Press the midpoint of the belt, the deflection shall be 10–15mm (or follow the belt manufacturer’s specifications).
After adjustment, tighten the adjusting plate bolts to 14–24N·m to ensure the belt runs without slipping or abnormal noise.
- Wiring Specifications
First connect the ground wire, then the B+ terminal (torque: 6–8N·m), and finally plug in the regulator connector (a "click" indicates proper locking).
Install an insulated cover on the B+ terminal; secure the wiring harness with cable ties and keep it at least 5cm away from high-temperature components (exhaust pipe, turbocharger).
IV. Function and Electrical Testing
- Static TestTurn the ignition switch to the ON position: The generator indicator light shall be on; after starting the engine, the indicator light shall turn off immediately with no abnormal alarms.
- Dynamic TestRun the engine at idle speed for 3–5 minutes: The generator shall have no vibration or abnormal noise; the bearing temperature shall not exceed 80℃. When the engine speed reaches 2000r/min, the output voltage shall stabilize at 27–28V.
- Electrical Parameters
No-load voltage: 28.0–28.5V (for 24V system).
Load test: Connect 50% of the rated load; the voltage shall be ≥27V with stable current and no fluctuation.
- Mechanical InspectionRotate the generator pulley: No jamming or axial movement (axial play ≤0.2mm).
V. Isuzu-specific Key Points
| Item | Isuzu Specifications | Precautions |
|---|---|---|
| Torque Parameters | Mounting bolts: 36–46N·m; Adjusting plate bolts: 14–24N·m; B+ terminal nut: 6–8N·m | Do not tighten with a pneumatic wrench to avoid housing deformation or bolt thread stripping |
| Belt Tension | Midpoint deflection: 10–15mm | Excessively loose belt causes slipping; excessively tight belt damages bearings and belt |
| Wiring Requirements | B+ wire cross-sectional area ≥15mm² (for 80A generator); Ground wire ≥10mm² | Insufficient wire gauge leads to overheating and burning |
| Mounting Clearance | ≥10mm from surrounding components | Prevent damage caused by vibration and collision |
Key Precautions for Installing Isuzu 24V Generator
I. Pre-installation Safety and Accessory Verification Precautions
1. Electrical Safety Specifications (Mandatory Compliance)
The negative battery cable must be disconnected throughout the installation process. Most Isuzu 24V models adopt dual-battery systems; it is necessary to disconnect the negative terminals of both battery packs simultaneously. Wait 5 minutes to discharge residual power in the electronic control system and the internal capacitor of the generator. Do not plug or unplug the wiring harness with power on to prevent damage to the generator regulator, ECU malfunction or electric shock to operators.
Clearly mark the generator's B+ terminal (thick cable interface) and regulator connector (multi-pin interface). Polarity reversal is strictly prohibited in the 24V system, as it will directly burn out the rectifier bridge and voltage regulator with irreversible damage. The regulator connector features a foolproof design—do not plug or unplug it by force.
Clean oil stains and metal debris in the installation area before operation to prevent impurities from entering the generator and causing bearing jamming or winding short circuit. Operators must wear insulated gloves and safety goggles to avoid injury from splashing components. It is strictly forbidden to leave tools or conductive debris in the engine compartment.
Complete Source Statement for Key Precautions for Installing Isuzu 24V Generator
I. Core Technical Sources from Original Manufacturers
| Source Type | Specific Name | Applicable Content | Access Channels |
|---|---|---|---|
| Original Factory Service Manual | Isuzu A-4JA1/A-4JB1 and other model service manuals (including generator disassembly and assembly chapter), Isuzu 24V Generator Service Manual, and corresponding engine service manuals | 1. Torque parameters of generator mounting bolts (M8: 36–46N·m), adjusting plate bolts (14–24N·m), and B+ terminal nuts (6–8N·m)2. Coaxiality deviation between generator pulley and crankshaft pulley ≤0.5mm3. Static/dynamic function verification standards for generators4. Requirements for fit degree and coaxiality positioning between generator and mounting bracket | Isuzu after-sales technical department, authorized dealers, formal automotive maintenance data platforms (e.g., Alldata, Mitchell 1) |
| Generator Assembly Technical Specifications | Isuzu Generator Component Assembly Manual (OEM standard document) | 1. Selection of high-temperature grease (temperature resistance ≥180℃), mandatory replacement of mounting bolts2. Assembly accuracy requirements for generator, pulley and regulator3. Installation specifications for generator waterproof sealing rings, polarity requirements for regulators | Technical documents of auto parts suppliers, professional maintenance databases |
| Technical Service Bulletin (TSB) | Isuzu Original Factory TSB | Corrective guidelines for bearing faults, voltage regulator abnormalities and poor wiring connections of certain batches of generators | Manufacturer's technical support system, professional automotive maintenance platforms (e.g., Alldata) |
II. National and Industry Standard Sources
| Standard Name | Issuing Authority | Core Applicable Clauses | Access Channels |
|---|---|---|---|
| Technical Conditions for Installation of Internal Combustion Engine Electrical Equipment | National Competent Authority for Internal Combustion Engine Industry | 1. Disconnect the negative battery terminal throughout the installation process and wait 5 minutes to discharge residual power2. Prohibit live operation of generator wiring harnesses3. Operators must wear protective equipment such as insulated gloves and safety goggles | Standard Platform of the State Administration for Market Regulation, official websites of industry associations |
| Requirements for Establishing Automotive Maintenance Enterprises (GB/T 16739-2014) | State Administration for Market Regulation, Standardization Administration of the People's Republic of China | 1. Environmental requirements for clean workbenches in maintenance operations2. Process specifications for component cleaning before assembly and prevention of impurity contamination3. Accuracy requirements for measuring tools such as torque wrenches (±3%) | National Standard Full-text Public System, formal industry publications, official website of the Ministry of Transport of the People's Republic of China |

