231006T002 231006T00A 231007T400 231007T402 231007T403 ALTERNATOR FOR NISSAN TD27 TD25 D22 12V
Applicable models:NISSAN D21 D22 TD27 TD25
Reference part number:231007T40A 23100-6T002 2506113,LR160728G,LR160728,LR170749G,LR160728B, ,LR160728C,LR160728E 23100C1201
| Rated output : | 12V 60A |
| Pulley : | 2PK |
| Size : | 24*18*17single unit inner box |
| Weight : | net weight:6.6KG gross weight:6.85KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | ACgenerator Alternator |
| Specification : | 12V 60A |
| Pulley : | 2PK |
| Brand : | nuojin |
| Number : | 231006T002 23100C1201 |
| Quality : | Remanufacture |
| Delivery time : | 10 day |





Pre-installation Preparation
Safety and Tool Preparation
Park the vehicle on a flat surface and pull the handbrake. Turn off the engine and allow it to cool down for more than 30 minutes to avoid scalds from high temperatures.
Prepare tools including a ratchet wrench, socket, torque wrench, screwdriver, jack, safety stand, and medium-strength thread locker. Disconnect the negative battery terminal to cut off power to the entire vehicle, preventing short circuits or electric shocks during operation.
Component Inspection
Confirm that the new 12V generator is compatible with the vehicle model, such as matching the corresponding engine model like the 4G series.
Check that the bearings of the new generator rotate smoothly and the carbon brush wear does not exceed 1/3 of the original length. If the pulley of the new generator is incompatible with the old one, remove the pulley from the old generator and install it on the new one.
Clean the dirt and rust at the installation position. If the mounting bracket has cracks or the positioning hole is deformed, replace it immediately.
Initial Fixation of the New Generator
Place the new generator at the installation position in the engine compartment (usually on the right front side of the engine).
Insert the lower through bolt and screw on the nut without fully tightening it. Then install the tensioner bolt with fixing and adjusting functions above the generator: first screw on the horizontal bolt, snap the vertical bolt into the adjustment slot, and then slightly tighten the horizontal bolt to reserve space for subsequent belt tension adjustment.
Connecting the Wiring
First, locate the positive terminal of the generator, slide the ring terminal of the corresponding cable over the terminal, and use a tool to initially screw on the bolt, ensuring the correct installation direction.
Then insert the signal wire connector of the generator smoothly and make sure the connector buckle is firmly locked to avoid loosening. For models with special terminal blocks, connect them according to the marks and never reverse the connections, as this may damage the voltage control system.
Installing and Adjusting the Drive Belt
Follow the original belt's winding path to fit the belt over the generator pulley, crankshaft pulley, and water pump pulley.
Adjust the belt tension by turning the vertical bolt above the generator to press down the generator. The appropriate tension allows you to easily bend the belt to approximately 90 degrees by hand. Excessive tension can accelerate bearing wear, while insufficient tension may cause the belt to slip.
Tightening All Bolts
Use a torque wrench to tighten the bolts in accordance with specifications to avoid damaging components due to improper force.
Taking models such as the Nissan Lannia as an example, the upper fixing bolt and the nut of the lower through bolt are recommended to be tightened to 23 Newton-meters, and the fixing nut of the positive wire to 18 Newton-meters.
If the mounting bracket is made of aluminum, the bolt torque should be 20%-30% lower than that for cast iron brackets to prevent thread stripping or bracket cracking.
Post-installation Inspection and Finalization
First, check that the generator is securely installed, the wiring is not tangled, and it is away from moving parts such as belts and fans. Then lower the vehicle (if jacked up earlier) and reconnect the negative battery terminal.
Start the engine and observe whether the generator fault warning light on the dashboard turns off. Use a multimeter to measure the output voltage of the generator; the normal range at idle is 13.5-14.5V.
Let the vehicle run for 5-10 minutes, pay attention to any abnormal noise or vibration of the generator, and confirm stable power generation. For Nissan models equipped with a variable voltage charging system, an OBD scanner is also required to perform a system operation check to ensure the normal operation of the control system.
I. Core Specifications for Safe Operation
Ensure the vehicle is turned off and the key is removed throughout the entire process. Wait for the engine compartment to cool down for more than 30 minutes before disconnecting the negative battery terminal to avoid scalds from high-temperature components such as the exhaust manifold and turbocharger, as well as prevent circuit short circuits.
Wear gloves and safety goggles during operation. The engine compartment is densely wired; avoid scratching the insulation layer of wires with tools or touching high-temperature pipelines and moving parts to prevent damage.
Strictly follow the sequence of "disconnect the negative terminal first, reconnect the negative terminal last" when disconnecting or connecting the battery. For models equipped with an ECU or variable voltage charging system, confirm there are no unsaved fault codes before powering off to prevent loss of electronic data or system malfunction.
II. Requirements for Component Compatibility and Pre-installation Preparation
The new generator must be fully compatible with the vehicle model and engine type. Focus on verifying the voltage regulator specifications, pulley groove count, and diameter. For example, generators for HR16DE and MR20DE engines cannot be interchanged—an incompatible pulley will cause transmission failure or abnormal belt wear.
Before installation, check that the new generator's bearings rotate smoothly without jamming, the carbon brush wear does not exceed 1/3 of the original length, and the rectifier and stator have no ablation marks. Clean rust and debris from the mounting bracket and positioning holes; if the bracket has cracks or the positioning hole is deformed, replace it immediately to avoid vibration during operation.
When reusing old bolts, inspect the integrity of the threads. Most Nissan models use fine-thread lock bolts; replacement with ordinary coarse-thread bolts is strictly prohibited. The bolt torque for aluminum brackets should be 20%-30% lower than that for cast iron brackets to prevent thread stripping or bracket cracking.
III. Taboos and Specifications for Wiring Connections
Connect the vehicle's main power cable to the generator's positive (B+) terminal. The crimped side of the ring terminal must face away from the generator housing. Control the torque between 16-18N·m when tightening the nut to avoid terminal deformation or thread damage.
Insert the signal wire connector smoothly and ensure the buckle is fully locked; do not plug or unplug it forcefully. Some models are equipped with dedicated terminals such as F (field) and IG (ignition), which must be connected according to wiring marks. Never misconnect or short-circuit them, as this will burn out the voltage regulator or ECU.
Organize the wiring harness and clip it into the original vehicle's fixing clips, keeping it away from moving parts such as belts and fans to prevent wire wear and short circuits. For models with a variable voltage charging system, the wiring should be kept away from high-temperature areas to avoid affecting signal transmission.
References:
- The content related to the installation of Nissan's 12V generator you previously inquired about does not come from a single fixed source. Instead, it is integrated from the official service manuals of Nissan models and practical operation summaries from professional automotive maintenance platforms. The specific source categories are as follows:
Official Service Manuals for Corresponding Nissan Models
- This serves as the core reference basis. For example, the exclusive service manuals of Nissan models such as Sylphy and Cima include special chapters on the disassembly and assembly of 12V generators. These documents clearly stipulate that installation must follow the reverse order of disassembly, and also detail operational specifications such as temporarily tightening bolts first and then finally tightening them in a specific sequence. The manuals for some models also mention the need to check the operating status of the variable power generation voltage control system after installation. In addition, the 2015 Nissan Full Vehicle Wiring Diagram Service Manual supplements requirements such as checking ECU self-diagnosis results and clearing fault codes after installation.
Practical Operation Summaries from Professional Automotive Maintenance Platforms
- Professional maintenance platforms represented by Auto Master feature many technicians sharing details of Nissan generator installation based on practical experience. For instance, senior technicians have summarized precautions such as the necessity of cutting off power before installation to prevent safety accidents, avoiding collisions with the generator housing during installation, and preventing bolt thread stripping. These contents supplement the official manuals, are more in line with actual daily maintenance scenarios, and help maintenance personnel avoid common minor issues in practical operations.