Generator 1005102688 1005102688 1005102688 1005102688 is suitable for Heavy Duty Truck Haomai
Applicable models:Heavy Duty Truck Haomai
Reference part number: 1005102688 1005102688 1005102688 1005102688
| Rated output : | |
| Pulley : | 8PK |
| Size : | 24*18*17single unit inner box |
| Weight : | Net weight 6kg |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | ACgenerator Alternator |
| Specification : | 8PK |
| Pulley : | |
| Brand : | NUOJIN |
| Number : | 1005102688 |
| Quality : | Remanufacture |
| Delivery time : | 30DAYS |






Installation Method of Sinotruk Howman Generator
Preparation Work
Equipment Inspection:
Environment Evaluation:
Tools and Materials:
Installation Foundation
Generator Positioning and Fixing
Exhaust System Connection
Fuel System Connection
Electrical System Connection
Inspection and Commissioning
Safety Operation Specifications
Ensure that the generator is powered off and the fuel system is closed throughout the installation process to avoid the risk of electric shock or fire caused by fuel leakage.
Wear a safety helmet, insulated gloves, and protective glasses during operation. When installing the exhaust system, additionally wear heat-resistant gloves.
It is prohibited to install in a closed space or an environment with flammable and explosive materials. Ensure that the operation area is well-ventilated and away from fire sources and flammable substances.
Installation Precision Requirements
The fixing bolts of the generator should be tightened with the specified torque (usually 25-35N・m, subject to the equipment manual) to prevent loosening due to operational vibration.
Electrical wiring must strictly follow the wiring diagram. The positive and negative poles should not be connected reversely, and the phases of the three-phase power supply lines should be correctly corresponding. Incorrect connection may burn out the generator or electrical equipment.
The connection of the exhaust pipeline should ensure tightness. The sealant or washer at the interface should be installed in place to avoid safety hazards caused by exhaust gas leakage.
Equipment Protection Points
Avoid colliding with the generator's casing and internal components during the installation process to prevent damage to core components such as the stator and rotor.
Before connecting the fuel pipe, clean the impurities at the interface to ensure that the pipeline is not bent or damaged. After connection, a pressure test should be carried out, and it can be put into use only when there is no leakage.
The adjustment error of the generator's level should be controlled within 0.5° to avoid increased wear of components caused by inclined operation.
Follow-up Use and Maintenance Tips
Before the first start, check the oil level, fuel quantity, and the tightness of each connection part. After starting, observe for any abnormal noise, vibration, or leakage.
Record the installation date, wiring method, and debugging parameters for subsequent maintenance and troubleshooting.
Regularly check the tightness of the generator's fixing bolts and the sealability of the fuel and exhaust systems. It is recommended to conduct a routine inspection once a month and a comprehensive maintenance every six months.
References:This passage may be compiled based on information integrated from the user manual, maintenance manual of the Sinotruk Howman generator, as well as relevant professional automotive maintenance websites and forums.