FAW 4DX23-65D alternatorJFWZ29C-B3701100-A12-YFD10
Applicable models:FAWYC6108 / YC6B125
Reference part number:JFWZ29ZL JFWZ2302 311-3701100 397-3701100 B8400 860117327 3701100-A12-YED10
| Rated output : | 1000W |
| Pulley : | 1PK |
| Size : | 24*18*17single unit inner box |
| Weight : | net weight:5KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | ACgenerator Alternator |
| Specification : | 1000W |
| Pulley : | 1PK |
| Brand : | NUOJIN |
| Number : | 3701100-A12-YED10 |
| Quality : | Regeneration |
| Delivery time : | 7--10DAY |





Installation Method of Yuchai 1000W Generator
I. Pre-installation Preparation
Equipment and Accessories Inspection
Installation Site Selection
Installation Foundation Treatment
II. Fixed Installation of the Generator
Positioning and Placement
Tightening Fixing Bolts
III. Electrical Connection Operation
Power Line Connection
Confirm that the generator power switch is in the "OFF" state and disconnect the external main power switch to avoid live operation.
For single-phase generators, connect the "live wire (L)" and "neutral wire (N)" at the generator output terminal to the corresponding terminals of the external load line respectively. The "ground wire (PE)" must be reliably connected to the ground electrode (ground resistance should be ≤4Ω). For three-phase generators, connect the load according to the "L1, L2, L3" phase correspondence to ensure consistent phases and avoid motor reversal.
When connecting wire harnesses, strip the wire insulation layer (length about 5-8 mm) to ensure the copper core is fully inserted into the terminal. After tightening the terminal screws, gently pull the wire to confirm no loosening.
Control Line Connection (if applicable)
IV. Installation of Auxiliary Components
Heat Dissipation System Installation
Fuel System Installation (for fuel-type generators)
For external fuel tanks, place the tank on the upwind side of the generator (distance not less than 1 meter from the generator to avoid high-temperature baking). Connect the fuel tank outlet to the generator inlet with a special oil pipe, install a gasket at the oil pipe interface, and tighten the pipe clamp to prevent fuel leakage.
Check if the fuel switch is flexible with no fuel dripping in the closed state. Before first use, fill the tank with fuel that meets the manual requirements (usually 92# or above unleaded gasoline, or 0# diesel, depending on the model), taking care not to overfill.
V. Post-installation Inspection and Testing
Comprehensive Inspection
Check all connection parts: including fixing bolts, terminals, oil pipe interfaces, etc., to confirm no loosening, missing connections, or wrong connections.
Check if the fuel level (for fuel-type generators) and oil level (some models require pre-filling oil) meet the requirements. The oil level should be between the "MIN" and "MAX" marks on the dipstick.
Check if the generator shell is reliably grounded with no obvious damage or electric leakage risk.
No-load Test
Turn on the generator power switch and start the generator (manual or electric start, operate according to the manual). Let the generator run under no-load for 5-10 minutes and observe the operating status: no abnormal noise or vibration, and stable voltage display on the instrument panel (1000W generators usually output 220V/50Hz, with voltage fluctuation ≤±5%).
Load Test
After the no-load test is normal, gradually connect the load (it is recommended to first connect 50% rated load, run for 3-5 minutes, then increase to 90% rated load). Observe if the generator output is stable, the load equipment works normally, and there is no overload alarm or automatic shutdown.
Precautions for Installation of Yuchai 1000W Generator
I. Safety Operation Specifications
Ensure the generator power switch and external main power switch are in the off state throughout the installation process. For fuel-type generators, additionally close the fuel valve to eliminate live or oil-carrying operations.
Operators must wear insulating gloves and safety goggles. Do not touch terminals or rotating parts with bare hands to avoid electric shock, mechanical scratches, and other risks.
Do not install in confined spaces, humid environments, or flammable and explosive areas. The installation site must be away from open flames and well-ventilated to prevent carbon monoxide accumulation or fire hazards.
II. Installation Precision Requirements
Tighten fixing bolts to the torque specified in the manual to prevent loosening due to vibration during operation. It is recommended to use spring washers to enhance anti-loosening effect.
Strictly distinguish between live wire, neutral wire, and ground wire during electrical connection. For three-phase models, ensure correct phase correspondence. Incorrect wiring may burn the generator or load equipment.
Conduct a tightness check after connecting fuel pipes. Open the fuel valve and observe the interface for 5-10 minutes. Start the equipment only after confirming no leakage.
III. Equipment Protection Key Points
Avoid colliding with the generator shell and internal components during installation to prevent damage to core elements such as the stator, rotor, and rectifier.
Ensure the heat dissipation cover is properly installed to keep the heat dissipation channel unobstructed, avoiding overheating shutdown due to poor heat dissipation during generator operation.
Do not disassemble any parts while the generator is running. If adjustment or inspection is needed, stop the generator first, cut off the power supply, and close the fuel valve.
IV. Subsequent Use and Maintenance Tips
Record the installation date, wiring method, and test data after installation to facilitate subsequent troubleshooting and maintenance.
For the first start, run the generator under no-load for 5-10 minutes. Gradually increase the load only after confirming no abnormalities. Do not start with full load directly.
Regularly check the tightness of bolts, the status of wire connections, and the tightness of fuel pipelines. It is recommended to conduct a comprehensive inspection at least once a month.
References:From the perspective of content, the installation methods and precautions for Yuchai generators involved have certain similarities with the relevant content released on the websites of manufacturers such as Taizhou Kaihua Diesel Generator Co., Ltd. and Jiangsu Xingguang Power Group. However, it cannot be confirmed that they are directly derived from these websites. If you want to know the more accurate source, you can further provide more detailed clues or background information to facilitate a more precise search.