Car AC generator C11BL-6T1395 C11BL6T1395 is suitable for Shangchaikate
Applicable models: Shangchaikate
Reference part number:C11BL-6T1395 C11BL6T1395
| Rated output : | |
| Pulley : | |
| Size : | |
| Weight : | Net weight 4.65KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | alternator |
| Specification : | |
| Pulley : | |
| Brand : | NUOJIN |
| Number : | C11BL-6T1395 C11BL6T1395 |
| Quality : | Remanufacture |
| Delivery time : | 10 day |




Installation Method of Shangchai Caterpillar Generator
Preparation
Confirm that the generator model and specifications match the actual requirements. Inspect the generator's appearance to ensure no damaged or missing components.
Prepare required installation tools (e.g., wrenches, screwdrivers, tape measures) and materials (e.g., fasteners, gaskets).
Select a flat, solid, and well-ventilated location for installation. Ensure sufficient space around the generator for future maintenance and inspection.
Foundation Construction
Build a stable foundation based on the generator's size and weight. Use reinforced concrete or steel plates as foundation materials.
After construction, ensure the foundation is flat, level, and capable of supporting the generator's weight.
Placing the Generator
Use hoisting equipment (e.g., cranes, forklifts) to lift the generator onto the foundation. Maintain balance during lifting to avoid collisions or damage.
Place the generator on the foundation, adjust its levelness with a level, ensure stability, and secure it firmly with fasteners.
Connecting Intake and Exhaust Pipes
Connect intake and exhaust pipes as required. Ensure tight connections with no air leakage.
Arrange pipes with a reasonable layout. Avoid excessive bends that may affect exhaust efficiency.
Connecting the Fuel System
For diesel generators, connect diesel pipes, filters, valves, and other components. Ensure good sealing to prevent leakage during connection.
The fuel tank is marked with oil inlet and return ports. Hold the other end of the oil inlet pipe, open the oil valve to fill the pipe with diesel, then insert it into the inlet. Secure with a screwdriver first, then tighten with a wrench. If there are air bubbles in the pipe, press the manual pump on the inlet to bleed air. Connect the return pipe according to the marks.
Installing the Electrical System
Select appropriate cables and junction boxes based on the generator's power and voltage requirements. The cable cross-sectional area must meet current-carrying capacity needs, and junction boxes should be waterproof, dustproof, and corrosion-resistant.
Connect the generator's output cables to the junction box or switchgear. Ensure firm, reliable connections that comply with electrical safety standards. Arrange and secure cables properly to avoid mechanical damage.
Connect the battery. The generator uses 12V electric start: connect the red wire to the battery positive terminal and the black wire to the negative terminal.
Installing Control Systems and Protection Devices
Install control systems and protection devices according to the generator's control requirements. The control system should enable remote control and automated management.
The protection device must cut off power promptly in case of generator failure to prevent damage.
Commissioning and Trial Operation
Conduct commissioning and trial operation after all installation work is completed.
First, check if all generator parameters (e.g., voltage, frequency, power) are set correctly.
Start the generator, observe its operation, and check for abnormal noise, vibration, or overheating.
Use tools such as a multimeter to measure output voltage and current to ensure they meet requirements. During commissioning, perform load tests to check performance under different load conditions.
Precautions for Installing Shangchai Caterpillar Generator
Safe Operation
Cut off all relevant power supplies before construction to avoid electric shock risks. Keep open flames away when connecting the fuel system.
Before hoisting the generator, confirm that the hoisting equipment's load capacity matches and the slings are secure. Operators must wear safety helmets and other protective equipment.
During commissioning and operation, unauthorized personnel are not allowed to approach the generator's rotating parts and high-temperature, high-pressure areas.
Foundation and Placement
The foundation's bearing capacity must be more than 1.2 times the total weight of the generator to prevent foundation settlement during long-term operation.
The generator's levelness error should be controlled within 0.5mm/m to avoid component wear or failure due to inclination.
Pipeline Connection
Conduct air tightness testing after connecting intake and exhaust pipes to ensure no leakage. Install heat insulation layers on exhaust pipes to prevent scalds and heat accumulation.
Clean impurities inside the fuel pipes before connection. Check tightness with soapy water after connection; put into use only if no bubbles are generated.
Electrical System
Cable wiring must comply with electrical specifications. Terminals should be tightly crimped to avoid poor contact and overheating. Separate weak current and strong current lines with a spacing of no less than 10cm.
Pay attention to the positive and negative polarities when connecting the battery; reverse connection is strictly prohibited. Check for looseness or oxidation at the connection after wiring.
Commissioning and Operation
Before the first start, check if the oil level, coolant level are normal, fuel is sufficient, and all components are firmly connected.
During trial operation, gradually increase the load, closely monitor parameters such as voltage, frequency, and temperature, and shut down immediately to troubleshoot if abnormalities are found.
Load tests should be performed at 25%, 50%, 75%, and 90% of the generator's rated power respectively to ensure stable performance under various working conditions.
References: