Automobile generator 56028697AP 56028697AM 56028697AL 56028697AO for Dodge Ram 1500 Pickup 5.7L (345) V8 2009-2012
Applicable models:Dodge Ram 1500 Pickup 5.7L (345) V8 2009-2012
Reference part number: 56028697AP 56028697AM 56028697AL 56028697AO 04801311AD 4801311AE P04801311AE 4210000731 421000-0722 4210000722 56028697AQ 11756 11229 11229N 421000-0730 4210000730 421000-0731
| Rated output : | 12V 150A |
| Pulley : | 7PK |
| Size : | 24*18*17single unit inner box |
| Weight : | Net weight 6kg |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | Altemator |
| Specification : | 12V 150A |
| Pulley : | 7PK |
| Brand : | nuojin |
| Number : | 56028697AL |
| Quality : | Remanufacture |
| Delivery time : | 10 day |





Preparation
Removing the Old Generator
Loosen the Belt: Locate the drive belt tensioner. Use tools such as a wrench or socket to loosen the belt according to the tensioner's operation method, then remove the belt from the generator pulley.
Disconnect Electrical Connections: Typically, you need to remove the nut of the B+ output terminal cable on the generator, take off the connected wire, and disconnect the field wire connector (which may require pressing the clip to release it).
Remove Mounting Bolts: Use a ratchet and socket to unscrew the generator's mounting bolts (usually 2 to 3 bolts). The bolt torque varies by engine type — for example, the torque for the generator mounting bolts of a 2.4L engine is 61N·m (45ft.lbs), while that for a 2.7L engine is 27N·m (20ft.lbs). Then take out the old generator.
Installing the New Generator
Position the Generator: Place the new generator in the original installation position and adjust it to align the mounting holes.
Install Mounting Bolts: Insert and initially tighten the mounting bolts, but do not fully tighten them. The final tightening must follow the torque standard corresponding to the engine type — e.g., 61N·m (45ft.lbs) for 2.4L engines and 27N·m (20ft.lbs) for 2.7L engines.
Connect Electrical Circuits: Attach the field wire connector to the interface at the bottom of the generator. Then place the B+ terminal wire on the mounting stud, install the nut of the B+ terminal cable, and tighten it to a torque of generally 10N·m (88.5in.lbs).
Install the Drive Belt
Inspection and Tightening
Restore Power Connection
Test the Generator
I. Safety Operation Specifications
Power Off and Parking Protection: Before installation, the negative battery cable must be disconnected. It is recommended to let it stand for 5-10 minutes to release the residual power in the circuit to avoid short - circuits or electric shock risks. Park the vehicle on a flat and solid ground, pull on the parking brake, and remove the ignition key to prevent the vehicle from moving accidentally during the operation. Wear insulating gloves throughout the process, keep the tool handles dry, and stay away from high - voltage components in the engine compartment.
Avoid High - Temperature and Mechanical Risks: If the vehicle has just been turned off, wait for high - temperature components such as the engine and exhaust pipe to cool down to room temperature to prevent high - temperature burns. During the removal and installation process, avoid tool collisions that may generate sparks, and stay away from flammable parts such as fuel lines. At the same time, avoid moving parts in the engine compartment to prevent accidental pinching.
II. Component Selection and Pretreatment
Precisely Match the Model Specifications: Give priority to using the original Dodge or brand - authorized 12V generator, and confirm that its model, power, installation hole positions, and electrical interfaces are completely suitable for the specific vehicle model and engine model (such as 2.4L, 2.7L, etc.). Avoid installation failures, abnormal power generation, or damage to surrounding components due to inconsistent specifications.
Comprehensive Inspection before Installation: Check that the new generator has no damage or deformation in appearance, and the B + terminal and magnetic field interface have no rust or looseness, and accessories (such as fixing gaskets, nuts) are complete. At the same time, check the drive belt. If there are cracks, aging, edge wear, or reduced elasticity, it needs to be replaced in time. The new belt needs to be confirmed to be suitable for the original vehicle.
III. Installation Operation Details
Electrical Connection Specifications: Strictly distinguish between the B + terminal and the magnetic field wire connector, and connect them in the order of "connecting the magnetic field wire first, and then the B + terminal wire" to ensure that the connection is firm and not loose. The B + terminal cable nut should be tightened according to the specified torque (generally 10N・m/88.5in.lbs). After the connection is completed, insulating tape can be used to wrap the exposed part to prevent electric leakage. When pulling out or inserting the connector, press the clip to operate, and do not pull the wire violently to avoid internal wire breakage.
Belt Installation and Tension Control: Before installing the belt, refer to the vehicle belt routing diagram to ensure that the belt routing is correct and there is no misalignment or twisting. When adjusting the belt tension, press the middle part of the belt by hand, and the sinking amount should be controlled at about 10 - 15mm. If the tension is too loose, it is easy to cause slipping and insufficient power generation. If it is too tight, it will aggravate the wear of the generator bearing and the belt, and even cause abnormal noise.
Bolt Tightening Standards: Use a ratchet and socket that match the bolt specifications to avoid bolt slipping caused by incorrect tool models. When fixing the generator, use the diagonal step - by - step tightening method to ensure uniform force, and strictly tighten the installation bolts according to the torque standards corresponding to the engine model (for example, the generator installation bolt torque of the 2.4L engine is 61N・m/45ft.lbs, and that of the 2.7L engine is 27N・m/20ft.lbs). The specific values shall be subject to the vehicle maintenance manual.
IV. Component Protection and Environmental Requirements
Protect Precision Components: When handling the generator, handle it with care to avoid damage to precision components such as internal coils and bearings caused by collisions or drops. During the installation process, avoid tool scratches on the generator housing or terminal connections, and ensure that plastic covers, rubber covers, and other components are properly reset to prevent dust and oil from entering the interior.
Keep the Installation Environment Clean: Clean the oil stains, dust, and metal debris in the generator installation area in the engine compartment to avoid impurities affecting the contact effect of the terminal connections or entering the generator bearing, which may lead to unstable power generation and accelerated component wear.
V. Testing and Follow - up Maintenance
Comprehensive Testing and Confirmation: After starting the vehicle, observe whether the charging indicator light goes out normally, and use a multimeter to measure the battery voltage. When the engine is running, the voltage should be in the normal range of 13.5V - 14.5V. At the same time, listen for any abnormal noise during the generator operation (such as bearing noise, belt friction noise), and check for no electric leakage or oil leakage in the engine compartment.
Short - term and Long - term Monitoring: In the short term (1 - 3 days) after installation, regularly check whether the generator fixing bolts are loose, whether the belt tension has changed, and whether there is any heating at the connection. During long - term use, combined with the vehicle maintenance cycle, check the generator bearing condition, belt wear, and terminal corrosion degree. If any abnormality is found, stop the machine for maintenance in time to avoid the expansion of the fault.
References:According to the text content and the provided search results, it is impossible to accurately determine the specific source of the passage about "the installation method and precautions of the Dodge 12V generator".
From the search results, Abstract 1 (dodgia.com) mainly involves some installation steps of the Dodge car generator and the tightening torque of bolts, etc. Abstract 2 (reader.haynes.com) mentions the removal and installation of the belt during the alternator replacement of some Dodge models, as well as the installation of the alternator, etc. However, the content of these is not completely consistent with the text you provided in terms of expression and structure.
The text you provided may be compiled by integrating a variety of materials. For example, it may refer to the official maintenance manual of Dodge vehicles, professional automotive repair books, or the content of some automotive repair websites. But based on the existing information, it is impossible to exactly point out its specific source.