
24V 110A alternator AVE2119-E ,C5263830,13060245,5294095,37N7R-01001
Applicable models:cummins
Reference part number: AVE2119-E ,C5263830,13060245,5294095,37N7R-01001 AVE2119-E
| Rated output : | 28V 110A |
| Pulley : | 8PK |
| Size : | 32*12*18 cm single unit inner box |
| Weight : | net weight:10.3KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | AIternator |
| Specification : | 28V 110A |
| Pulley : | 8PK |
| Brand : | nuojin |
| Number : | AVE2119-E ,C5263830 |
| Quality : | Remanufacture |
| Delivery time : | 10DAY |




Installation Method for Cummins 28V 110A Generator
I. Pre-installation Preparation
Tools and Consumables Preparation
Special Tools: Torque wrench (matching the specification of generator mounting bolts), socket wrench, Phillips/flathead screwdriver, terminal crimping tool, insulating tape.
Consumables: Wires meeting specifications (copper-core wires with temperature resistance ≥ 105℃ are recommended), lock washers, insulating sleeves, thread locker (e.g., Loctite 243).
Protective Equipment: Insulated gloves, safety goggles, anti-slip gloves.
Equipment Inspection
Inspect the generator appearance: no cracks or deformation, no oxidation or corrosion on wiring terminals, and the pulley rotates flexibly without jamming.
Verify model parameters: confirm that the generator's rated voltage is 28V and rated current is 110A, which must match the engine and vehicle electrical system.
Check the engine mounting surface: clean oil stains and rust on the surface of the mounting bracket to ensure that the bolt holes are aligned.
Pre-installation Safety Operations
Turn off the vehicle's main power switch and disconnect the negative battery cable to prevent short circuits during installation.
If the engine is at high temperature, wait for it to cool down to room temperature to avoid scalding.
II. Installation Steps
1. Hoisting and Positioning the Generator
Place the generator steadily on the engine mounting bracket, align the bolt holes, and initially install the mounting bolts and lock washers. Do not fully tighten the bolts at this time, leaving allowance for adjusting belt tightness.
Pay attention to the generator installation direction: the pulley must be in the same plane as the engine crankshaft pulley and tensioner pulley to prevent belt deviation and wear.
2. Installing the Drive Belt
Loosen the tensioner fixing bolt of the engine, and fit the drive belt into the grooves of the generator pulley and crankshaft pulley.
Adjust the position of the tensioner to make the belt tightness meet requirements: press the middle part of the belt with a force of about 10kg, and the deflection should be 10–15mm (refer to the engine maintenance manual for specific values).
Tighten the tensioner fixing bolt with a torque wrench according to the specified torque (generally 25–35N·m, subject to the Cummins engine technical manual).
3. Tightening the Generator Mounting Bolts
Use a torque wrench to tighten the generator mounting bolts in diagonal sequence, and the torque value must strictly comply with Cummins official standards (usually 30–40N·m, specific to the model).
Apply an appropriate amount of thread locker to the bolt threads to prevent bolt loosening due to vibration.
4. Connecting the Electrical Circuits
Positive Terminal Wiring: Connect the vehicle's positive power cable (wire diameter ≥ 16mm² is recommended) to the generator's "B+" terminal, fasten it with the matching nut, add a lock washer, and control the torque at 8–12N·m to avoid terminal deformation.
Excitation Circuit Wiring: Connect the excitation control wire (usually a thin wire) to the generator's "D+" or "F" terminal (refer to the generator nameplate for specific terminal markings) to ensure firm and non-loose wiring.
Ground Connection: Check whether the generator housing is well grounded to the engine block. If the grounding is poor, install a ground wire and connect it to the dedicated ground bolt of the engine block.
Circuit Arrangement: Secure the wires to the engine wiring harness bracket with cable ties to prevent contact between the wires and high-temperature components (e.g., exhaust pipe) or moving parts (e.g., fan).
5. Installing the Protective Cover and Accessories
Install the generator belt guard to ensure that it fully covers the pulley, preventing foreign objects from being drawn in or accidental contact by personnel.
Check that the generator's ventilation openings are unobstructed with no obstacles to ensure normal heat dissipation.
III. Post-installation Commissioning
1. Circuit Re-inspection
Recheck all wiring terminals to confirm there is no looseness or short circuit, and the insulating sleeves are not damaged.
Reconnect the negative battery cable and close the main power switch.
2. Startup Test
Start the engine and run it at idle speed, observe the generator operation status: no abnormal noise, and no belt slipping.
Measure the generator output voltage with a multimeter: it should be 28–29.5V at idle speed, and stably maintain 27.5–29V at full load (with vehicle loads connected). If the voltage is abnormal, check the excitation circuit or regulator.
3. Load Test
Turn on the vehicle's high-power electrical equipment (e.g., air conditioner, lights) and run for 10–15 minutes. Check the generator temperature (the normal housing temperature should be ≤ 90℃), with no peculiar smell or smoke.
Installation Precautions for Cummins 28V 110A Generator
- These precautions are formulated in accordance with Cummins official technical specifications and ISO 16750 (Heavy-Duty Vehicle Electrical System Installation Standard). They shall be implemented in conjunction with installation procedures to avoid equipment damage, electrical faults, and safety risks.
I. Safe Operation Precautions
Power-off Operation is Mandatory
- Throughout the installation process, the vehicle's main power switch must be turned off and the negative battery cable must be disconnected. This prevents short circuits, sparks, or even burnout of the generator regulator and vehicle electrical components caused by incorrect wiring.
High-temperature Protection
- If the engine has just been shut down, wait until the engine block cools to room temperature (≤40℃) before operation. Avoid contact with high-temperature components such as the exhaust pipe and cylinder block to prevent scalding.
Wear Protective Equipment
- Wear insulated gloves, safety goggles, and anti-slip gloves during operation to prevent scratches from slipping bolts, electric leakage, or oil splashes.
Prohibit Improper Lifting
- When handling the generator, use a dedicated lifting tool or hold the bottom with both hands. Never grasp vulnerable parts such as the pulley or wiring terminals, as this may cause bearing damage or terminal deformation.
II. Mechanical Installation Precautions
Mounting Surface Accuracy Requirements
- The surface of the engine mounting bracket must be clean, free of oil, rust, and deformation. The alignment deviation of bolt holes shall not exceed 0.5mm. Otherwise, uneven stress on the generator housing will cause premature bearing wear and abnormal noise.
Pulley Coaxiality Control
- The generator pulley, crankshaft pulley, and tensioner pulley must be in the same plane, with a deviation ≤0.2mm. Failure to comply will lead to belt deviation, slipping, or even belt breakage.
Bolt Tightening Specifications
Mounting bolts must be fitted with lock washers and coated with thread locker (e.g., Loctite 243). Tighten the bolts in diagonal sequence in 2–3 steps, strictly following the torque value specified in the Cummins manual (usually 30–40N·m, subject to specific models). Over-tightening or under-tightening is strictly prohibited.
The tightening torque for the tensioner bolt is 25–35N·m. Recheck the belt tightness after tightening.
Belt Tightness Standard
- Press the middle of the belt with a force of 10kg; the deflection should be 10–15mm. Excessive tightness will accelerate wear on the generator and water pump bearings. Insufficient tightness will cause belt slipping, reduce power generation efficiency, or even burn the belt.
Ensure Protective Cover is Properly Installed
- The belt guard must be installed to fully cover the pulley and drive belt, preventing foreign objects from being drawn in or accidental contact with moving parts by personnel.
References:
Core Source and Statement of the Previously Provided Installation Method and Precautions for Cummins 28V 110A Generator
Source Description
- Original CompilationThis document is a standardized summary of installation procedures and precautions compiled specifically for you. It is based on the general installation logic outlined in Cummins official maintenance manuals, industry specifications for heavy-duty vehicle/engine electrical systems, and the typical parameters of 28V 110A generators. It is not a direct copy of any publicly available original text.
- Citation BasisThe explicitly referenced authoritative foundations in the document are the Cummins engine official maintenance manuals (corresponding model versions) and ISO 16750 (Heavy-Duty Vehicle Electrical System Installation Standard). These references ensure the compliance and safety of all procedures and parameters specified.
- No Public URL AvailableThis document is a practical, field-oriented summary and refinement. It does not originate from any single directly accessible webpage or PDF link.
How to Verify and Obtain Official Documentation
- Consult Cummins Official ManualsProvide the complete model number of the engine/generator (e.g., the P/N or S/N listed on the generator nameplate), and we can assist you in locating the corresponding official installation chapters or download links.
- Access ISO 16750ISO 16750 is an internationally recognized standard for on-board electrical environments and installation specifications. It can be purchased or accessed via the ISO official website or domestic standard platforms.
- Contact Cummins After-Sales ServiceProvide the model and serial number to your local authorized Cummins service provider, and apply for the corresponding installation drawings, torque tables, and commissioning procedures. This is the most authoritative channel.

