
Alternator T430452,3218902,5606100,5606102,21211N 8600375,ALD8903NB 8600687,T405758 for caterpillar
Applicable models:caterpillar
Reference part number:T430452,3218902,5606100,5606102,21211N 8600375,ALD8903NB 8600687,T405758 ALD8903LK,T430452 ALD8903ML
| Rated output : | 12 volts, 100 amperes |
| Pulley : | 8T |
| Size : | 24*18*17single unit inner box |
| Weight : | Net weight 6.1kg, gross weight 6.45kg |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | ACgenerator Alternator |
| Specification : | 12 volts, 100 amperes |
| Pulley : | 8T |
| Brand : | NUOJIN |
| Number : | T430452,3218902,5606100 |
| Quality : | Remanufacture |
| Delivery time : | 30DAY |





The installation method of the Caterpillar 12V generator may vary depending on the specific model. Here are the general installation steps:Preparation before installation • Check the equipment: Inspect whether the generator has any external damage and whether all components are complete to ensure that the generator is in good physical condition. At the same time, check whether the levels of engine oil, coolant, etc., are normal to avoid the impact of engine failures on the operation of the generator. • Prepare tools and materials: Prepare tools such as screwdrivers, wrenches, and multimeters, as well as materials such as wires of appropriate specifications, terminals, and insulating tape.Take safety measures: Before wiring, all power supplies must be disconnected, and the generator must be completely isolated from the power grid, loads, etc. At the same time, wear protective equipment such as insulating gloves and insulating shoes. • Determine the installation location: Choose a flat, stable, and well-ventilated ground, ensuring there is sufficient space around for maintenance and operation. • Secure the generator: Place the generator base at the predetermined position, adjust it to a horizontal state using a level, and fix it to the ground with screws. Then, place the generator body on the base, ensure the contact surface is flat, and fix it with screws.Connecting wires • Identifying terminals: A 12V alternator generally has terminals such as "+", "F", "-", "N", etc. Among them, the one with the thickest diameter is the "+" terminal. • Connecting wires: Connect "B+" to the positive pole of the battery, "N" to the charging indicator control circuit, "F" (magnetic field) to F of the regulator, the ground wire to the vehicle body ground or the negative pole of the battery, and the regulator "+" to the ACC gear of the ignition switch.Inspection and Testing • Circuit Detection: After completing the wiring, use a multimeter to detect the circuit. Check for short circuits and open circuits between the various lines. Measure the insulation resistance between the live wire and neutral wire, and between the live wire and ground wire. The insulation resistance should not be less than 0.5 megohms. • No-load Test Run: After confirming that the circuit connections are correct, conduct a no-load test run first. Start the generator and observe its operating status, including whether parameters such as rotational speed, voltage, and frequency are normal. • Load Operation: After the no-load operation is normal, gradually connect the load and observe the generator's operation under load conditions. Pay attention to the changes in voltage and current to ensure that the generator can supply power stably and the load can work normally.
When installing the Caterpillar 12V generator, the following precautions should be noted:Preparation before installation • Inspect the equipment: Carefully check whether the generator's exterior is damaged and whether all components are complete. At the same time, check if the levels of engine oil, coolant, etc., are normal. • Prepare tools and materials: Prepare tools such as screwdrivers, wrenches, and multimeters, as well as materials like wires of appropriate specifications, terminals, and insulating tape. The wire specifications must be able to carry the rated current of the generator. • Confirm the installation location: Choose a well-ventilated area free of moisture and flammable materials to place the generator, and ensure that the distance between the generator and the power load is appropriate.During the installation processSafe operation: Before installation, all power supplies must be disconnected, the generator must be completely isolated from the power grid, loads, etc., and protective equipment such as insulating gloves and insulating shoes must be worn. Correct wiring: Clearly understand the labels and functions of the generator terminals. For example, AC generators generally have terminals such as "+", "F", "-", "N", etc. The "B+" should be connected to the positive pole of the battery, and "N" should be connected to the charging indicator control circuit, etc. When wiring, ensure the connections are firm to avoid loosening. Wires with different functions should be properly marked, and sufficient safety distances should be maintained between wires and between wires and other components.Secure Installation: Use appropriate lifting equipment to hoist the generator, place it stably on the installation foundation, align it with the anchor bolt holes, and then lower it gently. Tighten the anchor bolts in batches and evenly in a diagonal sequence to prevent deformation of the base. During and after the tightening process, recheck the alignment. • Belt Installation: When installing the drive belt, pay attention to adjusting the tension; either too tight or too loose will affect the working performance of the generator.Post-installation Inspection • Final Inspection: Rotate the rotor by hand to confirm that it rotates flexibly without jamming or friction noise. Check whether all bolts are tightened, whether the wiring is correct and secure, and measure the insulation resistance again to ensure it is qualified. • No-load Test Run: Perform a jog start, observe whether the motor rotation direction is correct, and check for any abnormal noise or vibration. After confirming the correct rotation direction, start the generator officially for no-load operation. During the operation, closely monitor and record parameters such as current, vibration, sound, and bearing temperature. The no-load operation time should generally be no less than 1 hour. • Load Test Run: After the no-load operation is normal, connect the load for the test run. The load should be increased gradually, and continue to closely monitor parameters such as current, vibration, and temperature until full-load operation, ensuring that all parameters are within the allowable range.
For reference only

