
cutch pressure plate 330-1600050 662 662HD00000 330-1600050 662 662HD00000 330-1600050 662 662HD00000 330-1600050 662 662HD00000 FOR Four wheel drive vehicle, liberated dump truck
Applicable models:Four wheel drive vehicle, liberated dump truck
Reference part number:330-1600050 662 662HD00000
| Rated output : | |
| Pulley : | |
| Size : | 325MM |
| Weight : | et weight 14.45 Gross weight 14.85 |
| Packaging : | Neutral packaging |
| Spot/Pre sale : | Presale |
| Warranty : | 1 year |
| Product number : |
| Type : | Clutch Pressure Plate |
| Specification : | |
| Pulley : | |
| Brand : | NUOJIN |
| Number : | 330-1600050 662 662HD00000 |
| Quality : | NEW |
| Delivery time : | 30 days |





The following is the general installation method for the clutch pressure plate of Jiefang dump trucks: • Preparation work: Prepare appropriate tools such as wrenches, sockets, torque wrenches, etc., as well as new components like the clutch pressure plate, clutch disc, release bearing, etc. Park the vehicle on a flat and safe ground, turn off the engine, and disconnect the negative cable of the battery to prevent electric shock or short circuit during the installation process. • Removal of related components: Depending on the specific structure of the vehicle, it may be necessary to first remove some components that hinder the installation of the clutch pressure plate, such as the transmission, drive shaft, etc., to obtain sufficient operating space. During the disassembly process, pay attention to marking the installation positions and directions of each component to ensure correct reinstallation later.Remove the old pressure plate and clutch disc: Loosen the bolts that secure the clutch pressure plate to the flywheel. There are usually multiple bolts; loosen them gradually in a diagonal sequence. Then, remove the old clutch pressure plate and clutch disc and place them properly. • Clean the installation area: Use a cleaning cloth or a special cleaning agent to thoroughly clean the surface of the flywheel, removing impurities such as oil stains, dust, and metal debris. Ensure the flywheel surface is clean, flat, and free of scratches to guarantee the stable installation of the new pressure plate and the proper performance of the clutch. • Install the new pressure plate: Align the new clutch pressure plate with the locating pins or holes on the flywheel to ensure accurate installation position. Then, screw the fixing bolts into the threaded holes of the flywheel, but do not tighten them.Tightening the pressure plate bolts: Use a torque wrench to gradually tighten the fixing bolts of the pressure plate according to the specified torque value and the cross-tightening sequence. This can make the pressure plate bear force evenly, avoiding problems such as deformation or abnormal operation caused by uneven force. The tightening torque of the pressure plate fixing bolts may vary for different vehicle models, generally ranging from several tens of N·m to over one hundred N·m. For specific values, please refer to the maintenance manual of Jiefang dump trucks. • Installing the clutch disc: Insert the side of the clutch disc with the damper disc facing the pressure plate direction, align it with the center holes on the pressure plate and flywheel, and insert it gently. Ensure that the guide hole of the clutch disc is aligned with the guide bearing of the transmission input shaft. A special tool or the transmission input shaft can also be used for auxiliary positioning.Install the release bearing and other components: Mount the release bearing onto the release fork, ensuring it is properly installed and can rotate flexibly. Then, reinstall the transmission and other components back onto the vehicle in the reverse order of removal, and securely tighten the relevant connecting bolts. • Inspection and debugging: After installation, recheck whether components such as the clutch pressure plate, clutch disc, and release bearing are installed correctly and securely, and whether the gaps between the components meet the requirements. Connect the negative battery cable, start the engine, press the clutch pedal to feel if the pedal's travel and force are normal, conduct a gear shifting test to check if shifting is smooth, and listen for any abnormal noises. If there are any issues, they should be promptly identified and resolved.
The key points for installing the clutch pressure plate of Jiefang dump trucks are to avoid the three major risks: "uneven force, component damage, and installation misalignment". After all, dump trucks have heavy loads, and the clutch operates under more severe conditions. Installation details directly affect service life and driving safety. I. Before installation: Conduct basic inspections to avoid "assembling with defects" • Inspection of component compatibility: It is necessary to confirm that the models of the new pressure plate and clutch disc match the vehicle. Special attention should be paid to the elastic parameters of the pressure plate diaphragm spring and the material of the clutch disc's friction lining (dump trucks mostly use wear-resistant types) to prevent clutch slippage or incomplete disengagement due to inconsistent specifications.Surface treatment of flywheel and pressure plate: Lightly grind the fitting surfaces of the flywheel and pressure plate with sandpaper (800 grit or higher is recommended) to remove residual oil, rust, or debris from old friction plates; if the flywheel surface has scratches deeper than 0.5mm, heat cracks, or a flatness deviation exceeding 0.1mm, the flywheel must be repaired or replaced first. Otherwise, it will cause uneven force on the pressure plate and early wear of the friction plate.Preparation of Tools and Auxiliaries: Prepare a torque wrench (with an accuracy of ±5%), a pressure plate positioning and guiding tool (special tools are preferred; if no special tool is available, the transmission input shaft can be used as a substitute), and high-temperature grease (only used on the contact part between the release bearing and the shift fork; it is forbidden to apply it on the friction surfaces of the pressure plate or clutch disc).During installation: Control key details to ensure "precise placement" Pressure plate bolt tightening: Strictly follow the "cross sequence + step-by-step tightening" • First, manually screw all bolts in to ensure the pressure plate is not offset; then use a torque wrench to gradually tighten them to the specified torque in 2-3 steps in a "diagonal cross" sequence (the common torque for Jiefang dump trucks is 80-120N・m, and specific values shall be subject to the vehicle maintenance manual). • It is forbidden to tighten a single bolt at one time or to fasten them out of sequence, otherwise it will cause deformation of the pressure plate, resulting in uneven wear of the clutch disc and stuck separation.Clutch disc positioning: Ensure "coaxiality" • When installing the clutch disc, a guiding tool must be inserted through the splined hole of the disc and the flywheel guide bearing to ensure that the clutch disc is completely coaxial with the flywheel and pressure plate; if installed without positioning, the transmission input shaft may push the clutch disc out of alignment when inserted, leading to difficulty in shifting gears or abnormal bearing noise. • Pay attention to the installation direction of the clutch disc: The side with the damper disc (having a convex structure) faces the pressure plate, and the flat side faces the flywheel. Incorrect installation (reversed) will result in insufficient clutch release stroke.
References:The content of my notes on the installation precautions for the clutch pressure plate of Jiefang dump trucks mainly refers to the following materials: • Autohome: There are multiple Q&A and articles on Autohome that cover the installation precautions for clutch pressure plates. For example, during installation, it is necessary to ensure that all fulcrums, bearing surfaces, and release bearings are coated with grease; the side of the clutch driven disc with the damper disc should face the pressure plate; bolts should be tightened diagonally alternately and in multiple steps according to the specified torque; after installation, check the free clearance between the release bearing and the diaphragm spring or the free clearance of the clutch pedal, etc. These contents have provided me with practical operational experience.Pacific Auto Network: The relevant materials on Pacific Auto Network elaborately state that before installation, one should prepare tools and new components, clean the installation environment, and inspect the installation site; during installation, align the new pressure plate with the flywheel locating pins and tighten the bolts crosswise and gradually according to the specified torque; after installation, manually rotate the pressure plate to check if it runs smoothly, start the vehicle to see if the clutch pedal travel is normal, and so on. Its comprehensive introduction to the installation process and key points for attention serves as an important reference for me to sort out the precautions.Golden Hoe Library: The article "Installation Methods and Key Points for Heavy-Duty Diesel Vehicle Clutches" in the Golden Hoe Library mentions that before installation, it is necessary to check the fit between the engine crankshaft, the first shaft of the gearbox and the bearing, check whether the crankshaft and gearbox oil seals are leaking, and check the wear condition of the flywheel and pressure plate surfaces, etc.; during installation, a special alignment spline should be inserted into the flywheel bearing hole, then the pressure plate and clutch disc assembly should be installed in sequence. When tightening the bolts, first hand-tighten the bolts for temporary fastening, then use a wrench to alternately tighten each bolt diagonally, with each tightening being 1-2 turns appropriate, and other contents. This is very helpful for improving the installation precautions of the Jiefang dump truck clutch pressure plate.

